Plants for energy supply and district heating:
eins energie EVS AG District Heating Grid of the city Chemnitz in Saxony complete E/MSR-scope with B&R-Multicontrol, PCS B&R DCS2000
Agratec Biogas Energy Plant Jessen (5 MW el.)

Automation with S7-400/ET200S, Profibus DP,
process control system Simatic PCS7

AREVA Biomass Energy Plant Valorbois/Belgien
(3.57 MW el.)
Automation with Simatic S7-300/400,
SCADA-system WinCC V7.0
Strabag Umweltanlagen GmbH Biogas Energy Plant MBA Brest/Belorussia
(3x1,5MW el.)

complete Automation switch gear with process control system PCS7, Profibus DP, redundant PLC and Server

Environmental technology:
Gicon Bioenergie GmbH Biogas Energy Plant Schöllnitz/Brandenburg complete Automation switch gear, Simatic S7, WinCC
Strabag Umweltanlagen GmbH Biogas Energy Plant Lechfeld complete Automation switch gear mit Simatic S7-400,
Fieldbus Profibus DP, process control system PCS7
Linde AG Biogas Energy Plant Lissabon (2 MW el.) complete Automation switch gear mit Simatic S7-400,
Fieldbus Profibus DP, process control system PCS7
Western Isles Council Biogas Energy Plant MBA Western Isles (800 kW el.) complete Automation switch gear with PCS7
Fieldbus system Profibus DP
Sewage treatment plants:
Stadtwerke Niesky Central sewage water treatment plant Niesky complete Automation switch gear  with redundant PCS7 V8.0, Fieldbus system with Profibus DP
Wismut AG Water treatment plant Ronneburg complete Automation switch gear with PCS7 V7.1, Fieldbus system with Profibus DP
Schoeller KG Waste water treatment Papierfabrik Weissenborn/Saxony complete Automation switch gear with Simatic S5-135, SCADA-system COROS LS/B Win
eins energie Central sewage water treatment plant of Chemnitz/Saxony complete Automation switch gear with S5-155, conn. to Siemens LSX, Migration nach PCS7 V7.1
Pure water and drinking water plants:
Südsachsen Wasser GmbH Potable water treatment plant Burkersdorf in Saxony wit 12 open and 20 closed filters complete Automation switch gear  with S7-400/Profibus DP, PLS PCS7 mit reduntantem Multi-Serversystem
Zweckverband Fernwasser Südsachsen Potable water treatment plant Einsiedel near Chemnitz/Saxony with 16 open filters complete Automation switch gear with S7-400/Profibus DP, pcs PCS7 with reduntant Servers
Landestalsperrenverwaltung Sachsen Water reservois and buildings of the LTV Saxony Migration of Simatic S5 to Simatic S7 with process control system Wonderware/Intouch
Stadtwerke Reichenbach Potable water treatment plant  Reichenbach, new treatment plant with 4 filters complete Automation switch gear with S7-400 and process control system PCS7
Process engineering at industial plants:
Hartsteinwerke Hüttengrund Pre-crusher for split- and gravel production with conveying and milling Automation with B&R-Multicontrol, panels for operating, signalisation
UNIDEK Dämmstoffe Isolation material production for building industry in Burkhardtsdorf/Saxony Automation of styrofoam block forming, block transport and logistics
Erlenbacher Backwaren Frozen cake production Erlenbach complete Automation switch gear with with S5-135 and Fieldbus system ASI
Building automation:
enviaM Building control of the office building of the formerly EVS AG Automation with B&R Multicontrol and process control system B&R DCS2000 with Burklimat
eins energie Central garage and central catering facility of the eins energie in Chemnitz/Saxony complete Automation switch gear with B&R-Multicontrol and Burklimat-System
etna Luwa Carlsberg Brewery Frederikja/Danmark, climatisation of the high bay warehouse Carlsberg/Coca Cola complete Automation switch gear with PCI-PLC and Fieldbus-system Profibus DP, process control system PCS7-Box V7.0
Schoeller KG paper production plant Weissenborn/Saxony, climatisation of the paper stock complete Automation switch gear with Simatic S7-300 and Simatic Multipanels
Research and development:
Agratec AG/FuE Intelligent processing for working optimization of Biogas-CHP's Simatic S7-400 mit ET200S und Profibus DP, PLS PCS7
Gicon Bioenergie GmbH/FuE/INNOWATT Biogas R&D-educational plant of the BTU Brandenburg/Cottbus complete Automation switch gear with VIPA-SPS and SCADA-system Simatic WinCC
Eurofins Jena Fermentation tower Niederdorla/R&D complete Automation switch gear of Longtime-trial-installation for fermentation of waste

 

 

 

 

 

 

 